Ballinabranna Group Water Supply Scheme
(1) Rising Mains between Wells
(2) Upgrade of Distribution Main Contract 4
Client: Ballinabranna Group Water Supply Co-operative Society Ltd.
Completed:
2007 & 2009
• 1.9km of 110mm diameter uPVC pipe.
• 1.6km of 160mm diameter uPVC Pipe.
• Associated Fittings. • 4.5km of 110mm diameter HDPE pipe.
• 1.6km of 160mm diameter HDPE pipe.
• Associated Fittings.
(2) Upgrade of Distribution Main Contract 4
Client: Ballinabranna Group Water Supply Co-operative Society Ltd.
Completed:
2007 & 2009
• 1.9km of 110mm diameter uPVC pipe.
• 1.6km of 160mm diameter uPVC Pipe.
• Associated Fittings. • 4.5km of 110mm diameter HDPE pipe.
• 1.6km of 160mm diameter HDPE pipe.
• Associated Fittings.
Ballinkillin Surface Water Pipeline 2009
Client: Carlow County Council
Completed:
2009
• 1.5km of 300mm diameter Surface Water pipe.
• Associated Manholes & Gullies.
• Outfall to river at existing bridge.
Completed:
2009
• 1.5km of 300mm diameter Surface Water pipe.
• Associated Manholes & Gullies.
• Outfall to river at existing bridge.